Skip to content

Quality

Inspection scoped to the part, not to a brochure

Every quote states what will be measured, on which features, and what you receive as evidence. Nothing on this page is a certification badge—it is the working method we use for export orders, and it is written down before metal is cut.

First article · In-process · Final · Documentation

01 Baseline

What every order gets

These four things are included unless your drawing says otherwise. They are not sold as an upgrade.

01

Material verification

Incoming bar, plate, and sheet checked against the grade on the PO. Mill certificates supplied when the order calls for traceability.

02

In-process checks

Agreed hold points during the run—typically first piece, mid-run, and after any tooling change—so a drift is caught before the batch is finished.

03

Final dimensional check

The features marked on your drawing are measured and recorded before packing. Unmarked cosmetic surfaces are inspected visually.

04

Photos before packing

Parts photographed as packed, with labels visible, so you can approve the shipment before it leaves or catch a packing error early.

02 Levels

Four levels of evidence

Pick the level that matches the risk of the part. Level 4 and 5 add measurable time and cost, so they are quoted as line items rather than folded into a hidden margin.

Level What we do Fits when You receive
L1 — Standard Visual check plus spot dimensions on the features we flagged during quoting. Brackets, guards, covers, and parts where fit is forgiving. Packing photos; dimensions noted on the traveler.
L2 — Documented Every ballooned dimension on your drawing measured and written down. Assembly interfaces, mating parts, first orders from a new drawing. Dimensional report (spreadsheet or PDF) with the batch.
L3 — First article Full FAI on the first part from new tooling or a new setup, before the run continues. New dies, new fixtures, transferred programs, pilot builds. FAI report referencing drawing balloons, plus photos.
L4 — Layout / CMM Coordinate measurement of position, profile, and datum-referenced features. GD&T callouts, tight true position, safety-adjacent geometry. Layout report with measured vs nominal values.
L5 — PPAP-style Scoped package assembled to the checklist your quality team supplies. Production programs where your customer requires a submission pack. Documents per your checklist, agreed and priced before the order.

Levels are a starting point for discussion, not a catalogue of certificates. The quote names the level and the features covered.

03 FAI

How a first article actually runs

A first article is a gate, not a formality. If it fails, we correct the setup and repeat it before the batch continues—the run does not “catch up later”.

01

Balloon the drawing

We number every dimension that matters and agree which ones are critical. Ambiguous callouts get a question before setup, not after.

02

Approve the setup

Fixture, datum scheme, and tool path confirmed. For stamping, the die is tried on scrap before the first production blank.

03

Measure the first part

Every ballooned feature recorded against nominal. Values outside tolerance stop the run.

04

Report and release

The FAI report goes to you with photos. Only after your release—or our internal sign-off on lower-risk parts—does the batch run.

05

Hold the reference

The approved first part is kept as the visual and dimensional reference for the rest of the order and for repeat orders.

04 Limits

What we do not claim

  • We do not publish certificates we do not hold. If your PO requires a specific standard, tell us in the RFQ and we will confirm what can be provided before you order.
  • We are not a calibration lab. Where a report needs accredited traceability, we say so and quote it as a separate service through a partner.
  • We do not inspect features nobody defined. Cosmetic acceptance criteria have to be written down—otherwise “good looking” becomes an argument at receiving.
  • We do not promise zero defects. We promise a defined inspection plan, honest reporting when something is out, and a clear path for rework or replacement.

Measuring equipment we use

Calipers and micrometers, height and depth gauges, pin and thread gauges, radius and surface-roughness comparators, granite surface plate. Coordinate measurement is booked with a partner for layout work.

Documentation formats

Dimensional reports as PDF or spreadsheet, FAI reports ballooned to your drawing, material certificates as issued by the mill, packing lists and commercial invoices for freight.

If something is out of tolerance

You get the measurement, the quantity affected, and the options: rework, replace, or use-as-is with your written concession. We do not ship and explain afterwards.

05 FAQ

Inspection questions

Is inspection included in the price?
Level 1 is included in every quote. Levels 2 to 5 add measurable time, so they appear as a line item—you can see what the evidence costs before you approve it.
Can you inspect to our drawing only?
Yes. Send the drawing with critical dimensions marked, or let us balloon it and send the numbered version back for your approval before the run starts.
Do you provide material certificates?
Mill certificates are supplied when the PO specifies them. Heat-lot traceability and country-of-origin paperwork are quoted with the material.
What happens with a rejected batch?
We review the measurement together, agree whether the cause is dimensional or cosmetic, and choose rework, replacement, or a written concession. Freight for a verified supplier fault is on us.
Can we audit or visit?
Serious buyers are welcome to see how parts move through the shop. Send your checklist in advance so we can align on what can be shown on your timeline.

Next step

Send the drawing and the inspection requirement together

If the drawing is still open, say which dimensions are critical and we will scope inspection around them instead of guessing.